Posted on Leave a comment

EPD Laboratories, Inc. Work Episode Summary

This video wraps up the work episode at EPD Laboratories, Inc. from Aug to Sep timeframe. This includes the ground radio receiption, telluric transmission, earth signal reception, novel audo amplifier project, glom locker cleanup and misc. A LOT was accomplished. Help us accomplish even more by supporting this work with your donations.

To support EPD Laboratories, Inc. 501(c)3 non profit with is Telluric, Earth Signal and other electrical research, please donate here: https://ericpdollard.com/donate

Learn more about Eric Dollard’s work here: https://emediapress.com/product-category/authors-presenters/eric-dollard/

Posted on Leave a comment

Part 4 – Earth Signal Line Repair

Justin Miller & Connor Fisher repairs a broken line one one of the pole sections by the repeater cabinet – this video is from 2 different days.

Donate to EPD Laboratories, Inc 501(c)3 non profit https://ericpdollard.com/donate

Eric Dollard’s book & presentations: https://emediapress.com/product-category/authors-presenters/eric-dollard/

Posted on Leave a comment

Part 3 – Earth Signal Pole Installation

Installing pole right next to the shack that receives the seismic signals.

Donate to EPD Laboratories, Inc 501(c)3 non profit https://ericpdollard.com/donate

Eric Dollard’s book & presentations: https://emediapress.com/product-category/authors-presenters/eric-dollard/